List of Projects and Involvement:
2007-2010
2008-2009
2008-2009
2008-2009
2007
2007
2007
2006-2007
2006
2008-2009
2008-2009
2008-2009
2007
2007
2007
2006-2007
2006
Running Four crews. Three on the South portal and the other on Shaftston Ave. All crews and involved with all the engineering set out requirements for each section, reports and redesign work.
To carry out setout works and redesign work (approx. 90%) for the construction of the Recycle Pipeline. Working with a combination of GPS and Terrestrial Survey equipment. To carry out as constructed surveys and service location details through the pipeline corridor.
Carrying out the setout works for Roads, Services and bulk earth works. Volumetric and quantities. Construction of 450 lots for a retirement village.
Carrying out engineering setout requirements for the construction of roads and other civil services for Queensland Government Project Services.
Setout work for the construction of the new ramps into the new BP Service Station. Activities involved: conformance reports, volumetric and quantities, S/O of roads, services, signs and line marking.
To carry out setout works for the construction of the South portal. This includes bridges, bulk earth works, monitoring and pile work.
Carry out the setout and conformance of 3km of new highway, bridge crossings etc. Run and maintain control network and work in with Machine Guidance Technology. Volumetric and quantities.
Setout works for the bulk earth works, car parks, entry roads and services. Volumetric and quantities. Redesign was carried out during the project and was undertaken by PDM Surveys.
To carry out the S/O of roads, services, car parks, piles, pile caps, columns, earth works, retention basins, retaining walls, Volumetric and quantities.
To carry out setout works and redesign work (approx. 90%) for the construction of the Recycle Pipeline. Working with a combination of GPS and Terrestrial Survey equipment. To carry out as constructed surveys and service location details through the pipeline corridor.
Carrying out the setout works for Roads, Services and bulk earth works. Volumetric and quantities. Construction of 450 lots for a retirement village.
Carrying out engineering setout requirements for the construction of roads and other civil services for Queensland Government Project Services.
Setout work for the construction of the new ramps into the new BP Service Station. Activities involved: conformance reports, volumetric and quantities, S/O of roads, services, signs and line marking.
To carry out setout works for the construction of the South portal. This includes bridges, bulk earth works, monitoring and pile work.
Carry out the setout and conformance of 3km of new highway, bridge crossings etc. Run and maintain control network and work in with Machine Guidance Technology. Volumetric and quantities.
Setout works for the bulk earth works, car parks, entry roads and services. Volumetric and quantities. Redesign was carried out during the project and was undertaken by PDM Surveys.
To carry out the S/O of roads, services, car parks, piles, pile caps, columns, earth works, retention basins, retaining walls, Volumetric and quantities.
CLEM 7 North South Bypass Tunnel, Brisbane
Western Corridor Pipeline
Landpartners Pty Ltd
Seachange, Arundel
BMD
Kessels Road, MacGregor
McIlwain Civil
BP Chinderah
BMD
CLEM 7 North South Bypass Tunnel, Brisbane
Hwy Construction Fat Hen Creek McIlwain Civil
Riverlink Shopping Center
LEDA
IKEA Centre
DELTA Group
Western Corridor Pipeline
Landpartners Pty Ltd
Seachange, Arundel
BMD
Kessels Road, MacGregor
McIlwain Civil
BP Chinderah
BMD
CLEM 7 North South Bypass Tunnel, Brisbane
Hwy Construction Fat Hen Creek McIlwain Civil
Riverlink Shopping Center
LEDA
IKEA Centre
DELTA Group